Bathroom Installation and Design Specialists

Bathroom Installation and Design Specialists
We design your bathroom from our plumbers taking out your old bathroom suite out of the property and then repositioning all hot and cold pipes to the new positions for the new appliances.
All chasing of walls to install the new pipes then cover the pipes before plastering the wall level over them before the 2nd fix.
Shower valves either concealed in the wall and pipes before testing before covering pipes ready for tiling later.
Or surface shower mixer on finished tiled walls, and chrome pipes to professional finish.
Shower screens fitted last to give the finishing touches and securely fixed then a mastic finish to seal.
All vanity units fitted last and connected to hot and cold pipes and then finish off the waste and test to finish.
Toilet cistern fitted to wall then unit fitted around it then fit back to wall toilet pan and fit to the floor and seal then test both cistern and the pan, before fitting the toilet seat.